Bridge Road Water Main Project

pipe

Approximately 8,600-linear feet of 12-inch Ductile Iron Cement Lined (DICL) water main, hydrants, water services and associated appurtenances are to be installed as needed in the right-of-way of Bridge Road. Project area bounds are the intersection of March Road and Friedenfels Street to the south and to the north at the intersection of Pleasant Street and School Street. Also, approximately 130-linear feet of 12-inch high density polyethylene (HDPE) water main within an 18-inch high density polyethene (HDPE) sleeve to be installed by method of directional drilling. The project was designed by Weston and Sampson and the work will be done by Defelice Corporation at a cost of about $2.54 million.

Please see below for bi-weekly updates.