Street Maintenance & Construction Schedules-2017

-A A +A

Street Maintenance Program

Scope of Work:

Consists of shim and/or overlay existing streets with 1 ½" compacted asphalt, installed in place with tack coat, replace or repair structures as needed, saw cut adjoining transitional joints, provide street sweeping & traffic control.

2017 Street Paving Schedule:

12th Street West: From Carter Ave to 12th Street West 

Pleasant Street

Folly Mill Road: From Amesbury line to 16 Folly Mill Road

Seabrook Road (from Gerrish Road to 40 Seabrook Road)

Vic Lin Drive 

*The Public Works reserves the right to change or alter this schedule at any time. 

Construction Program

Scope of Work:

The program includes but is not limited to roadway profiles, sidewalks, repair and replace asphalt, install/repair and replace water/sewer lines and drainage as needed. It also includes, but is not limited to the maintenance, repair and or replacement of municipal facilities.

2017 Sidewalk/Roadway Construction:

Seabrook Road: 

This project will consist of two phases, engineering and construction. The engineering portion will consist of wetlands flagging and surveying of the roadway. The construction portion will consist of paving and adding sidewalks.

Construction work is scheduled to begin 5-1-17 and is expected to end around 7-21-17 (weather permitting). 

Work will take place as follows:

  • Mobilization
  • Erosion Control
  • Sidewalk/Curb Layout
  • Storm Drain Test Pits
  • Storm Drain (Gerrish Road)
  • Storm Drain (Seabrook Road)
  • Tree Removal
  • Relocate walls/plantings
  • Curbing
  • Sidewalks
  • Landscaping
  • Final Cleanup 

For more information regarding this project, please contact Lisa Pearson, Town Planner, at 978-463-2266. 

*The Public Works reserves the right to change or alter this schedule at any time.