All documents are to be submitted in triplicate at least
two weeks in advance of the DRC meeting to allow time for preliminary review
prior to the meeting.
Provide contact information to enable requests for additional
information prior to the meeting.
- Design narrative
addressing the manner in which the project conforms to each of the Overlay
Guildelines.
- Well developed drawings
of site work and buildings.
Include detailed floor plans, sections and elevations. Drawing are
to present full expression to the committee of the intent and nature of the
project.
- A
colored rendering depicting as accurately as possible the architectural
character, materials, and site improvements of the project.
- An
outline spec of all the materials used on the exterior of the structure, i.e.,
siding, trim, windows, doors, roofing, railings, awnings, exterior lighting,
etc. Samples or catalog cuts
should be included.
- In
the event that some materials have not been selected, the applicant must
submit adequate details of the construction to show that the character of the
project is consistent with the intent of the Beach Overlay District zoning
by-law (Salisbury Zoning Bylaw 2005, Section XE).
- A
discussion of the image, commercial or recreational activities, streetscape
and other aspects of the project intended to enhance the experience and
character of the Beach District.
The Committee will vote on the submission and convey its
decision and report to the Planning Board.
The materials above will be a part of the project approval. The Planning Board would then have the
responsibility for monitoring the final plans and actual construction for
compliance with our approvals.